MECHANICAL EQUIPMENT SUPPORT PROJECTS
New Port Richey City Hall
Analysis of the existing steel rooftop and building roof structure for the loads of a new chiller placed adjacent to the existing chiller and structural design of connections to the new chiller to the existing platform
Blue Pearl Tampa
Design of a new concrete equipment pad with a housekeeping pad for a new chiller, along with a design of a CMU screen wall extension and design of a slab pour back at the interior space for the new equipment.
Brandon High School
Design of a steel platform and footing for a new chiller.
Bryan Elementary School
Completed analysis of several existing classroom buildings for new roof mounted equipment and design of necessary strengthening.
Heart of FLorida
Designed tie downs for new units and analyzed the existing structure for the new loading.
lutz preparatory school
Analysis for existing steel bar joists for the loading of 3 RTUs including design of tie down details.
turner bartels k-8
Structural analysis of the existing roof structure for new rooftop MAU’s along with design of strengthening as it was needed.
city of tampa old city hall
Structural analysis of the existed roof structure for 4 new rooftop condensing units along with design of strengthening.
desoto memorial hospital
Design of new concrete pads for 2 new chillers, a new CMU screen wall around the new chillers, and an opening in the existing CMU screen wall.
pasco high school ahu
Structural design of new steel beams spanning between two existing CMU walls to hang new AHUs.
​
manatee county jail
Completed a structural design of new steel frames to support existing exhaust fan curbs. The existing exhaust fans were removed and replaced with new and utilize curb adapters.
steinbrenner high school
Structural analysis of the existing roof structure for two new rooftop MAU’s and 14 new exhaust fans along with design of strengthening as needed. The project also included a structural design for a new slab and pad for a new chiller.
hurston tower
Structural analysis of the existing exhaust fan stand and a design of modifications to adapt to fit the proposed exhaust fan .
gaf rtu
Structural analysis of the existing roof structure for the replacement of an existing RTU with new heavier RTU. Along with a design of strengthening and design of tie downs for the new unit.
south sumter high school
Structural analysis of the existing rood structure of building 3 and 10 for the additional loading of new roofing material on top of the existing roofing as well as strengthening and repair designs were done as needed.
pitney bowes
Analysis of the existing roof rack for the new equipment loading and a design of tie downs for the new unit.
sheraton sand key
Analysis of the existing rooftop platform for the new equipment loading and a design of tie downs for two new units replacing similar units.
cirkul ware house
Rooftop exhaust fan replacement with an analysis of the existing steel bar joists for the new equipment loading. Along with a design of tie downs for the new units and strengthening.
barbara s ponce library
Design of tie downs for two new units on the existing Pate curbs.
clark building
Structural analysis of the existing post-tensioned roof structure for the replacement of existing RTUs and design of strengthening as it was needed.
lonza
Structural analysis of the existing roof structure for the replacement of existing RTUs as well as design of strengthening for support frames and roof openings as it was required.
tia piper hangers
Structural design of a unit strut pipe hangers.
lake wales advent health
Structural analysis of the existing roof structure to support one new roof top unit along with a design of structural strengthening required and tie downs.
citrus county jail
Analysis of existing roof structure for new rooftop equipment and design of new support. Also design of tie downs for the new equipment and a review of the existing modified wall openings were done in addition to the analysis.
usf manholes
Structural design of a new cast in place concrete lid for an existing concrete vault.
pasco east records storage
Design of tie downs for one new unit and the new unit replaced a similar sized existing unit. The new unit was also placed on a new custom designed stand.
lighthouse point
Design of rooftop equipment tie downs.
aventura mall
Design of rooftop equipment tie downs with an analysis of the existing roof structure.
cutler bay
Design of rooftop equipment tie downs for one new unit with an analysis of the existing roof structure.
s tamiami trail
Design of a steel frame to support a new rooftop curb between existing steel bar joists.
atrium cooling tower
Structural analysis of the existing rooftop structure for the loading of the new cooling tower and platform along with verifying the design of the new cooling tower platform.
northside baptist Church
Structural analysis of the existing rooftop structure for the loading of new rooftop units with one of the units placed on an existing steel platform and the another unit placed on a new curb.
vinoy cooling tower
Structural analysis of the existing roof structure and design of a new steel rooftop platform to support new cooling towers.
john morris building
Structural design of exterior duct support brackets and connection to the structure.
hcc cooling tower
An existing cooling tower was replaced with a new cooling tower for this project along with an analysis of the existing cooling tower concrete piers and foundation as well as design of tie downs for the new cooling towers.
American Injectables Cooling Tower Pads
Structural design of a new exterior concrete pad to support a new cooling tower.
Pine Grove Es Chiller
Calculated wind loads on the existing chiller. Verification if wind tie down is required. Determined if Structural design of wind tie downs were needed.