top of page
PXL_20230330_173946861.jpg

RENOVATION PROJECTS

PXL_20230330_173946861.jpg

Ed White Hospital

 Interior renovation of an existing 6 story cast in place concrete building with non-load bearing exterior CMU walls. Phase 1 of the renovation was half of the existing first floor that required structural design of details for new CMU wall opening infill, Existing CMU wall opening infill, and structural support of an operable partition. Phase 2 was a Structural design of repairs details as necessary, Structural design of supports for new rooftop equipment, new wall openings in existing CMU walls and new exterior light gauge metal stud walls throught, existing wall opening infill and evaluation of existing exterior openings for new windows were all completed for this project.

google earth.jpg

Woodson Museum Renovation

Interior renovation of the existing museum which included modification of existing CMU wall openings as well as slab trenching for new utilities. 

gcjfcs reno

Structural design for column removal in the conference room as well as structural design of details for the infill of 2 exterior openings.

bottom of page