

SCHOOL PROJECTS

Academy of Holy Names Wellness Center
Structural design of a 14,000 square feet addition composed of a new weight room, concessions, press box and roof terrace. Construction consisted of load bearing CMU and steel roof framing with metal deck.

Seven rivers High School
Two story 32,000 square feet classroom building, constructed out of CMU with a composite slab for the 2nd floor and a steel bar joist roof system. An approximately 4,700 sqft lobby space between the gymnasium and the classroom building with the gymnasium being approximately 13,000 sqft preengineered metal building.

HCC shade sails review
Reviewed the existing condition of the shade sail connection points to see if repairs would be determined necessary after the 2024 hurricanes.

HCC Gym Analysis
Analysis of existing roof framing for the loading of temporary hanging equipment utilized in the NCAA final four tournament.